Stationary Window Waterleak Repair
Exterior TrimVisual Aiming Preparation Procedure
Important: Some state and local laws specify requirements for
headlamp aim. Comply with all of these laws when performing any
headlamp aiming operations.
Headlamp aim should be checked:
When a new headlamp capsule is installed.
If service or repairs to the front end area have, or may have, ...
Installation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing
(1).
Clean and prepare the attaching surfaces for spot welding and brazing.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear
of structural adhesive.
Apply structural adhesive to all attaching surfaces ...
Electrical System Overload
The vehicle has fuses and circuit breakers to protect against an electrical system
overload.
When the current electrical load is too heavy, the circuit breaker opens and
closes, protecting the circuit until the current load returns to normal or the problem
is fixed. This greatly reduces the c ...