Lighting
Exterior Lamp ControlsRear Compartment Lid Emblem/Nameplate Replacement (VCDi)
Rear Compartment Lid Emblem Assembly
Caution: Refer to Exterior Trim Emblem Removal Caution in the
Preface section.
Procedure
The part and surface should be 21°C (70°F) prior to installation. The
vehicle should remain 21°C (70°F) for
one hour after assembly to allow adhesive to deve ...
Installation Procedure
Position the front end upper tie bar (1) on the vehicle.
Verify the fit of the front end upper tie bar.
Clamp the front end upper tie bar into position.
Braze accordingly.
Braze accordingly.
Grind down weld seams as needed for related panels and components.
Clean a ...
Service Vehicle Messages
SERVICE AC SYSTEM
This message displays if there is a problem with the air conditioning system.
Take the vehicle to your dealer for service.
SERVICE POWER STEERING
This message displays if there is a problem with the power steering system. Take
the vehicle to your dealer for service.
SERVICE ...