After the scheduled services are performed, record the date, odometer reading, who performed the service, and the type of services performed in the boxes provided. Retain all maintenance receipts.


Maintenance Replacement Parts
Technical DataInstallation Procedure
Cut the front compartment front rail in corresponding locations to fit
the remaining original panel. The sectioning joint should be
trimmed to allow a gap of one-and-one-half-times the metal thickness at the
sectioning joint.
Create a 50 mm (2 in) backing plate from the unused porti ...
Hood Hold-Open Rod Replacement
Warning: Refer to Hood Hold-Open Device Warning in the Preface section.
Preliminary Procedure
Remove the radiator grille reinforcement support. Refer to Radiator Grille
Reinforcement Support Replacement.
Hood Hold Open Rod Pivot (Qty: 2)
Hood Hold Open Rod
...
Ultra High Strength Dual Phase Steel
This information provides repair recommendations and general guidelines for
steel classified as Ultra High Strength Dual Phase Steel (Dual
Phase Steel with a tensile strength greater than 800 MPa), also known as DPX.
General Motors recommends the following when repairing or replacing this type ...