Service Publications Ordering Information
Reporting Safety Defects to the United States GovernmentInstallation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing
(1).
Clean and prepare the attaching surfaces for spot welding and brazing.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear
of structural adhesive.
Apply structural adhesive to all attaching surfaces ...
Rear Side Door Check Replacement
Preliminary Procedure
Remove rear side door trim panel. Refer to Rear Side Door
Trim Replacement
Remove the rear side door water deflector. Refer to Rear Side Door Water
Deflector Replacement
Rear Side Door Check Bolt
Caution: Refer to Fastener Caution in the Pre ...
Fuel Additives
To provide cleaner air, all gasolines in the United States are now required to
contain additives that help prevent engine and fuel system deposits from forming,
allowing the emission control system to work properly. In most cases, nothing should
have to be added to the fuel.
However, some gas ...