Open the glove box by lifting up on the lever.
Instrument Panel Storage
CupholdersInstallation Procedure
Cut the body lock pillar outer panel in corresponding locations to fit
the remaining original panel. The sectioning joint should be
trimmed to allow a gap of one-and-one-half-times the metal thickness at the
sectioning joint
Create a 50 mm (2 in) backing plate from the unused portio ...
Installation Procedure
Clean and prepare the attaching surfaces for brazing.
Apply structural adhesive to the attaching surfaces.
Position the rear bumper impact bar stud plate on the vehicle.
Verify the fit of the rear bumper impact bar stud plate
Clamp the rear bumper impact bar stud plate into ...
Waterleak Test Preparation
GM vehicles are designed to operate under normal environmental
conditions.
The design criteria for sealing materials and components takes into
consideration the sealing forces required to withstand the natural
elements. These specifications cannot take into consideration any artificial ...