Open the glove box by lifting up on the lever.
Instrument Panel Storage
CupholdersInstallation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the front
compartment upper side rail as noted from the original panel.
Clean and prepare the attaching surfaces for welding.
Position the front compartment upper side rail on the vehicle.
Verify the fit of the fr ...
Service Vehicle Messages
SERVICE AC SYSTEM
This message displays if there is a problem with the air conditioning system.
Take the vehicle to your dealer for service.
SERVICE POWER STEERING
This message displays if there is a problem with the power steering system. Take
the vehicle to your dealer for service.
SERVICE ...
Installation Procedure
Install NEW stabilizer shaft insulators (1) to stabilizer shaft (2) so
that the slit in the insulator is facing the rear of the vehicle.
Install the insulator c 2. lamp to the insulator:
2.1. Position the clamp (2) over on the insulator.
2.2. Use two M8 bolts (1, 3) with 40 ...