Open the glove box by lifting up on the lever.
Instrument Panel Storage
CupholdersInstallation Procedure
Cut the rear side rail in corresponding locations to fit the remaining
original panel. The sectioning joint should be trimmed to allow a
gap of one-and-one-half-times the metal thickness at the sectioning joint.
Create a 50 mm (2 in) backing plate from the unused portion of the
serv ...
New Vehicle Break-In
Notice: The vehicle does not need an elaborate break-in. But it will
perform better in the long run if you follow these guidelines:
• Do not drive at any one constant speed, fast or slow, for the first 805 km (500
mi).
Do not make full-throttle starts. Avoid downshifting to brake or slow the v ...
Front Side Door Weatherstrip Replacement - Door Side
Front Side Door Check Bolt
Caution: Refer to Fastener Caution in the Preface section.
Tighten
25 N·m (19 lb ft)
Front Side Door Weatherstrip - Door Side
Procedure
Unclip weatherstrip 1. from front side door.
When removing protective liners from adhesive tape, be careful no ...