Replacement Bulbs
Electrical System OverloadInstallation Procedure
Prepare all mating surfaces as necessary.
Align the body lock pillar outer panel reinforcement.
Create 8 x 24 mm (5/16 x 15/16 in) slots for MIG-brazing upper (1) and
lower (2).
Clean and prepare the attaching surfaces for spot welding and brazing.
Position the body loc ...
Waterleak Test Preparation
GM vehicles are designed to operate under normal environmental
conditions.
The design criteria for sealing materials and components takes into
consideration the sealing forces required to withstand the natural
elements. These specifications cannot take into consideration any artificial ...
Installation Procedure
Note: If the location of the original plug weld holes can
not be determined, space the plug weld holes every 40 mm (1½ in).
Drill 8 mm (5/16 in) for plug welding along the edges of the underbody
rear side rail reinforcement as noted from
the original panel.
Clean and ...