IntroductionInstallation Procedure
Create 8 x 14 mm (5/16 x 15/16 in) slots for MIG-Brazing along the edges
of the drivetrain and front suspension frame front support
as noted from the original panel.
Clean and prepare the attaching surfaces for brazing.
Position the drivetrain and front suspension frame ...
Headlamp Mount Panel Replacement (MIG-Brazing)
Note: According to different corrosion warranties, only the
regional mandatory joining methods are allowed.
Removal Procedure
Warning: Refer to Approved Equipment for Collision Repair Warning in the
Preface section.
Warning: Refer to Glass and Sheet Metal Handling Warning in the Preface sec ...
Engine Heater
The engine heater, if available, can help in cold weather conditions at or below
−18°C (0°F) for easier starting and better fuel economy during engine warm-up. Plug
in the heater at least four hours before starting the vehicle. An internal thermostat
in the plug end of the cord will prev ...