Cruise Control
Ultrasonic Parking AssistInstallation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-Brazing along the edges
of the front wheelhouse front panel as noted from the
original panel.
Create a 5 x 18 mm (4/16 x 11/16 in) slot for MIG-Brazing where front
wheelhouse front panel and front wheelhouse overlap.
C ...
Steering Gear Replacement (Hydraulic Power Steering)
Special Tools
EN 45059 Torque Angle Sensor Kit
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Turn the front wheels to the straight forward position and secure the
steering wheel from moving.
Remove the lower steering intermediate shaft bolt (1).
...
Shifting Into Park
Use this procedure to shift into P (Park):
1. Hold the brake pedal down and set the parking brake.
2. Hold the button on the shift lever and push the lever toward the front of the
vehicle into P (Park).
3. Turn the ignition to LOCK/OFF.
Leaving the Vehicle with the Engine Running
WARNING
It ...