Floor Mats
General InformationInstallation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the service
panel as noted from the original
panel.
Clean and prepare the attaching surfaces for welding.
Position the body lock pillar inner panel on the vehicle.
Verify the fit of the panel.
Clamp th ...
Air Conditioning Compressor Replacement (1.6L LDE, LXV, and 1.8L 2H0)
Preliminary Procedures
Recover the refrigerant. Refer to Refrigerant Rec . overy and
Recharging.
Remove drive belt. Refer to Drive Belt Replacement.
Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.
Disconnect the A/C compressor electrical connector
Re ...
Removal Procedure
Remove the drivetrain and front suspension frame. Refer to Drivetrain
and Front Suspension Frame Replacement.
Mark Installation position of insulator (2) at frame (1).
Cut out frame insulator core (1) from frame insulator (2).
Note: On the rear insulator dril ...