Battery Power Protection
IntroductionInstallation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the front
wheelhouse front panel as noted from the original panel.
Drill 8 mm (5/16 in) for plug welding where front wheelhouse front panel
and front wheelhouse overlap.
Clean and prepare the attaching surfaces f ...
Environmental Fallout (Acid Rain)
Caution: Refer to Clearcoat/Ultraviolet Screeners Caution in the
Preface section.
Note: Always refer to the manufacturer's packaged instructions for
the detailed procedures of materials used for compounding and/or
polishing.
Since the severity of the condition varies from area to area, proper ...
Installation Procedure
Apply structural adhesive on the flanges of the front side door inner
panel where the front side door outer panel bears on.
Align the front side door outer panel.
Verify the fit of the front side door outer panel.
Clamp the front side door outer panel into position.
Pre-f ...