Front Fog Lamps
Instrument Panel Illumination ControlBasecoat/Clearcoat Paint Systems
Warning: Exposure to isocyanates during paint preparation and
application processes can cause severe breathing problems. Read and
follow all of the instructions from the manufacturers of painting materials,
equipment, and protective gear.
All paint finish repairs of rigid exterior surfaces mus ...
Installation Procedure
Remove all mounds or loose pieces of urethane adhesive from the
pinch-weld area.
Inspect for any of the following problems in order to help prevent
future breakage of the window:
High weld
Solder spots
Hardened sealer
Any other obstruction or irregularity in the pinch-weld fla ...
Installation Procedure
Align the body side outer panel reinforcement.
Drill 8 mm (5/16 in) for plug welding along the edges of the body side
outer panel reinforcement as noted from the original panel.
Clean and prepare the attaching surfaces
for welding.
Position the body side outer pa ...