Accessories and Modifications
Doing Your Own Service WorkInstallation Procedure
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing along the edges
of the rear inner wheelhouse as noted from the original
panel.
Note: If the location of the original plug weld holes can
not be determined, space the slots every 40 mm (1½ in).
Clean and prepare the ...
Installation Procedure
Clean and prepare the attaching surfaces for welding.
Position the roof rear header panel (1) on the vehicle.
Verify the fit of the panel.
Clamp the roof rear header panel into position.
Spot weld accordingly as noted from the original panel.
Apply the sealer ...
Water Management Description and Operation
Plenum Water Flow Direction and Cleaning
A large percentage of water will flow off the windshield area into the plenum
chamber drain system and then down the outside on the
plenum to the underside of the vehicle. To ensure that the plenum chamber water
management system performs properly, the ...