Customer Satisfaction ProcedureService
This vehicle may have the new environmentally friendly refrigerant, R1234yf.
This refrigerant has a significantly reduced global warming impact on the environment,
compared to the traditional automotive refrigerant, R-134a. All vehicles have a
label underhood that identifies the refrigerant us ...
Installation Procedure
Prepare all mating surfaces as necessary.
Align the body lock pillar outer panel reinforcement.
Create 8 x 24 mm (5/16 x 15/16 in) slots for MIG-brazing upper (1) and
lower (2).
Clean and prepare the attaching surfaces for spot welding and brazing.
Position the body loc ...
Installation Procedure
Cut the front end upper tie bar in corresponding locations to fit the
remaining original panel. The sectioning joint should be trimmed
to allow a gap of one-and-one-half-times the metal thickness at the
sectioning joint.
Create a 50 mm (2 in) backing plate from the unused portion of ...