Trademarks and License Agreements
Climate Control SystemsInstallation Procedure
Prepare all mating surfaces as necessary.
Align the front hinge pillar body reinforcement.
Drill 8 mm (5/16 in) for plug welding along the edges of the front hinge
pillar body as noted from the original
panel.
Clean and prepare the attaching surfaces for welding.
...
Park Brake and P (Park) Mechanism Check
WARNING
When you are doing this check, the vehicle could begin to move.
You or others could be injured and property could be damaged.
Make sure there is room in front of the vehicle in case it begins to roll. Be
ready to apply the regular brake at once should the vehicle begin to move.
Park on ...
Steering Gear Boot Replacement
Special Tools
CH-804 Drive Axle Seal Clamp Pliers
Removal Procedure
Remove the steering linkage outer tie rod. Refer to Steering Linkage Outer
Tie Rod Replacement.
Remove the steering linkage inner tie rod nut (1).
Remove the steering gear outer boot clamp (2).
Loosen the st ...