If the carpet or the pad or insulator is wet, use the following criteria for drying or for replacing the components:
Drying Method
Front Floor Panel Carpet ReplacementInstrument Panel Compartment Replacement
Preliminary Procedure
Remove the instrument panel outer trim cover - right side. Refer to
Instrument Panel Outer Trim Cover Replacement - Right Side.
Instrument Panel Compartment Screw (Qty: 5)
Caution: Refer to Fastener Caution in the Preface section.
Tighten
2.5 N·m (22 lb in)
...
Accident With or Without Air Bag Deployment - Component Inspections
Warning: Proper operation of the Supplemental Inflatable Restraint
(SIR) sensing system requires that any repairs to the vehicle
structure return the vehicle structure to the original production configuration.
Not properly repairing the vehicle structure could cause
non-deployment of the air b ...
Air Conditioning Compressor Replacement (1.6L LDE, LXV, and 1.8L 2H0)
Preliminary Procedures
Recover the refrigerant. Refer to Refrigerant Rec . overy and
Recharging.
Remove drive belt. Refer to Drive Belt Replacement.
Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.
Disconnect the A/C compressor electrical connector
Re ...