Trademarks and License Agreements
PrefaceInstallation Procedure
Remove the front wheelhouse rear panel brace (1) from service panel.
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing along the edges
of the front wheelhouse (1).
Clean and prepare the attaching surfaces for brazing.
Note: In MIG-brazing areas 50 mm (2 in) must b ...
Installation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the drivetrain
and front suspension frame front support as noted from the
original panel.
Clean and prepare the attaching surfaces for welding.
Position the drivetrain and front suspension frame front suppor ...
Installation Procedure
Create 8 x 14 mm (5/16 x 15/16 in) slots for MIG-Brazing along the edges
of the drivetrain and front suspension frame front support
as noted from the original panel.
Clean and prepare the attaching surfaces for brazing.
Position the drivetrain and front suspension frame ...