Specifications

Body systems
Moveable Window SchematicsInstallation Procedure
Remove rear end upper panel extension (1) from service part.
Cut
Cut the body side inner panel in corresponding locations to fit the
remaining original panel. The sectioning joint should be trimmed to
allow a gap of one-and-one-half-times the metal thickness at the sectioni ...
Front Bumper Energy Absorber Bracket Replacement
Preliminary Procedure
Remove the front bumper fascia opening cover. Refer to Front Bumper Fascia
Opening Lower Cover Replacement
Drivetrain and Front Suspension Frame Bolt Front
Caution: Refer to Fastener Caution in the Preface section.
Tighten
160 N·m (119 lb ft)
Note: Do NOT reu ...
Tracing Powder or Chalk Test
Clean the weatherstrips and the contact surfaces with cleaning solvent.
Apply powder or chalk in an unbroken line to the contact surface of the
weatherstrip surrounding the perimeter of the suspected
areas.
Close the panel completely without slamming the panel. Closing the panel
comple ...