Chevrolet Cruze Repair Manual: Installation Procedure

- Cut the rocker outer panel in corresponding locations to fit the
remaining original panel. The sectioning joint should be trimmed to
allow a gap of one-and-one-half-times the metal thickness at the sectioning
joint.
- Create 50 mm (2 in) backing plates from the unused portion of the
service part.
- Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing along the
sectioning cut on the remaining original part. Locate these slots
13 mm (1/2 in) from the edge of part and spaced 40 mm (1½ in) apart.
- Prepare all mating surfaces as necessary.
- Fit the backing plates halfway into the sectioning joints, clamp in
place and braze to the vehicle.
- Align the rocker outer panel.
- Clean and prepare the attaching surfaces for spot welding.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear of
structural adhesive.
- Apply structural adhesive to the attaching surfaces.

- Position the rocker outer panel on the vehicle.
- Verify the fit of the rocker outer panel.
- Clamp the rocker outer panel into position.

- Spot weld accordingly.

- To create a solid braze with minimum heat distortion, make 25 mm (1 in)
stitch brazes along the seam with 25 mm (1 in) gaps
between them. Then go back and complete the stitch braze.
- Apply the sealers and anti-corrosion materials to the repair area, as
necessary. Refer to Anti-Corrosion Treatment and Repair.
- Paint the repaired area. Refer to Basecoat/Clearcoat Paint Systems.
- Install all related panels and components.
- Connect the negative battery cable. Refer to Battery Negative Cable
Disconnection and Connection.
- Enable the SIR system. Refer to SIR Disabling and Enabling.
Warning: Refer to Approved Equipment for Collision Repair Warning in the
Preface section.
Warning: Refer to Collision Sectioning Warning in the Preface section.
Warning: Refer to Glass and She ...
Note: According to different corrosion warranties, only the
regional mandatory joining methods are allowed. ...
Other materials:
Tire Inspection
We recommend that the tires, including the spare tire, if the vehicle has one,
be inspected for signs of wear or damage at least once a month.
Replace the tire if:
• The indicators at three or more places around the tire can be seen.
• There is cord or fabric showing through the tire's rubb ...
Electrical System Overload
The vehicle has fuses and circuit breakers to protect against an electrical system
overload.
When the current electrical load is too heavy, the circuit breaker opens and
closes, protecting the circuit until the current load returns to normal or the problem
is fixed. This greatly reduces the c ...
Installation Procedure
Clean and prepare the attaching surfaces for brazing.
Apply structural adhesive to the attaching surfaces.
Position the rear bumper impact bar stud plate on the vehicle.
Verify the fit of the rear bumper impact bar stud plate
Clamp the rear bumper impact bar stud plate into ...