Use this procedure to shift into P (Park): 1. Hold the brake pedal down and set the parking brake.
2. Hold the button on the shift lever and push the lever toward the front of the vehicle into P (Park).
3. Turn the ignition to LOCK/OFF.
Leaving the Vehicle with the Engine Running
WARNING
It can be dangerous to leave the vehicle with the engine running.
It could overheat and catch fire.
It is dangerous to get out of the vehicle if the shift lever is not fully in P (Park) with the parking brake firmly set. The vehicle can roll.
Do not leave the vehicle when the engine is running. If you have left the engine running, the vehicle can move suddenly. You or others could be injured. To be sure the vehicle will not move, even when you are on fairly level ground, always set the parking brake and move the shift lever to P (Park).
If you have to leave the vehicle with the engine running, the vehicle must be in P (Park) and the parking brake set.
Release the button and check that the shift lever cannot be moved out of P (Park).
Torque Lock
Torque lock is when the weight of the vehicle puts too much force on the parking pawl in the transmission. This happens when parking on a hill and shifting the transmission into P (Park) is not done properly and then it is difficult to shift out of P (Park). To prevent torque lock, set the parking brake and then shift into P (Park). To find out how, see “Shifting Into Park” listed previously.
If torque lock does occur, the vehicle may need to be pushed uphill by another vehicle to relieve the parking pawl pressure, so you can shift out of P (Park).
Retained Accessory Power (RAP)
Shifting out of ParkPretensioner Handling and Scrapping
Special Tools
EL-38826 SIR Deployment Harness
EL-39401-B SIR Deployment Fixture
For equivalent regional tools, refer to Special Tools.
Warning: When you are carrying an undeployed seat belt pretensioner:
Do not carry the seat belt pretensioner by the wires or connector on the
preten ...
Rail Dust Damage Repair
Warning: Refer to Eye Protection Warning in the Preface section.
Note: If rail dust has penetrated into the basecoat, the panel
requires refinishing. Ensure all the rail dust has been removed prior to
refinishing or the rust spots will return.
Rail dust damage comes from the tiny iron particles ...
Installation Procedure
Prepare all mating surfaces as necessary.
Align the front hinge pillar body reinforcement.
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing in locations
where you can not apply a resistance spot
welder.
Clean and prepare the attaching surfaces for spot welding a ...