ServiceScrapping Procedure
During the course of a vehicle's useful life, certain situations may arise
which will necessitate the disposal of a live (undeployed)
pretensioner. The following information covers the proper procedures for the
disposing of a live (undeployed) pretensioner. Deploy the
pretensioner before dispo ...
Installation Procedure
Position the front end upper tie bar (1) on the vehicle.
Verify the fit of the front end upper tie bar.
Clamp the front end upper tie bar into position.
Braze accordingly.
Braze accordingly.
Grind down weld seams as needed for related panels and components.
Clean a ...
Ultra High Strength Dual Phase Steel
This information provides repair recommendations and general guidelines for
steel classified as Ultra High Strength Dual Phase Steel (Dual
Phase Steel with a tensile strength greater than 800 MPa), also known as DPX.
General Motors recommends the following when repairing or replacing this type ...