Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed.
Installation Procedure
Removal ProcedureInstallation Procedure
Align the body side outer panel reinforcement.
Drill 8 mm (5/16 in) for plug welding along the edges of the body side
outer panel reinforcement as noted from the original panel.
Clean and prepare the attaching surfaces
for welding.
Position the body side outer pa ...
Installation Procedure
Cut the front compartment upper side rail in corresponding locations to
fit the remaining original panel. The sectioning joint should
be trimmed to allow a gap of one-and-one-half-times the metal thickness at
the sectioning joint.
Create a 50 mm (2 in) backing plate from the unused ...
Installation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the front
wheelhouse panel rear reinforcement as noted from the original
panel.
Drill 8 mm (5/16 in) for plug welding where front wheelhouse front panel
and front wheelhouse panel rear reinforcement overlap ...