Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed.
Installation Procedure
Removal ProcedureEngine Heater
The engine heater, if available, can help in cold weather conditions at or below
−18°C (0°F) for easier starting and better fuel economy during engine warm-up. Plug
in the heater at least four hours before starting the vehicle. An internal thermostat
in the plug end of the cord will prev ...
Anti-Corrosion Treatment and Repair (Base)
Warning: When applying sound deadeners, or anti-corrosion materials
due care and preventative measures must be exercised to prevent
any material from being sprayed into door and quarter panel mechanisms such as
door locks, window run channels, window regulators and
seat belt retractors, as wel ...
Rear Compartment Lid Emblem/Nameplate Replacement (Cruze - Left Side)
Rear Compartment Lid Emblem Assembly
Caution: Refer to Exterior Trim Emblem Removal Caution in the Preface
section.
Procedure
The part and surface should be 21°C (70°F) prior to installation. The
vehicle should remain 21°C (70°F) for
one hour after assembly to allow adhesive to deve ...