Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed.
Installation Procedure
Removal ProcedureInstallation Procedure
Cut the front end upper tie bar in corresponding locations to fit the
remaining original panel. The sectioning joint should be trimmed
to allow a gap of one-and-one-half-times the metal thickness at the
sectioning joint.
Create a 50 mm (2 in) backing plate from the unused portion of ...
Installation Procedure
Prepare all mating surfaces as necessary.
Align the front hinge pillar body reinforcement.
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing in locations
where you can not apply a resistance spot
welder.
Clean and prepare the attaching surfaces for spot welding a ...
Inflatable Restraint Module Handling and Scrapping
Special Tools
EL-38826 SIR Deployment Harness
EL-39401-B SIR Deployment Fixture
For equivalent regional tools, refer to Special Tools.
Live and Undeployed Inflator Module
Warning: Refer to SIR Inflator Module Handling and Storage Warning
in the Preface section.