Chevrolet Cruze manuals

Chevrolet Cruze Repair Manual: Installation Procedure

  1. Remove the front wheelhouse rear panel brace (1) from service panel.

  1. Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing along the edges of the front wheelhouse (1).
  2. Clean and prepare the attaching surfaces for brazing.

Note: In MIG-brazing areas 50 mm (2 in) must be kept clear of

Note: In MIG-brazing areas 50 mm (2 in) must be kept clear of structural adhesive.

  1. Apply structural adhesive on the front area (1) and create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing where the front wheelhouse and the front compartment side rail overlap (2).

  1. Position the front wheelhouse on the vehicle.
  2. Verify the fit of the front wheelhouse.
  3. Clamp the front wheelhouse into position.

  1. Braze accordingly.
  2. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair.
  3. Paint the repaired area. Refer to Basecoat/Clearcoat Paint Systems.
  4. Install all related panels and components.
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection.
  6. Enable the SIR system. Refer to SIR Disabling and Enabling.
Removal Procedure
Warning: Refer to Approved Equipment for Collision Repair Warning in the Preface section. Warning: Refer to Glass and Sheet Metal Handling Warning in the Preface section. Disable the SIR Syst ...

Front Wheelhouse Panel Rear Reinforcement Replacement (MAG-Welding)
Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed. ...

Other materials:

Engine Heater
The engine heater, if available, can help in cold weather conditions at or below −18°C (0°F) for easier starting and better fuel economy during engine warm-up. Plug in the heater at least four hours before starting the vehicle. An internal thermostat in the plug end of the cord will prev ...

Installation Procedure
Position the lower control arm (1) in the cradle. Install and hand tighten the NEW rear lower control arm bushing nuts and bolts (1). Install and hand tighten the NEW front lower control arm nut and bolt (1). Caution: Refer to Fastener Caution in the Preface secti ...

Installation Procedure
Create 8 24 mm (5/16 x 15/16 in) slots for MIG-brazing along the edges of the underbody rear side rail reinforcement as noted from the original panel. Clean and prepare the attaching  surfaces for brazing. Position the underbody rear side rail reinforcement on the ve ...

© 2011-2026 Copyright www.ccruze.com