Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed.
Installation Procedure
Removal ProcedureHigh Strength Low Alloy Steel
This information provides repair recommendations and general guidelines for
steel classified as High Strength Low Alloy Steel, also known
as HSLA. This type of steel normally has a tensile strength range from 300-700
MPa.
General Motors recommends the following when repairing or replacing th ...
Installation Procedure
Remove the front wheelhouse rear panel brace (1) from service panel.
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing along the edges
of the front wheelhouse (1).
Clean and prepare the attaching surfaces for brazing.
Note: In MIG-brazing areas 50 mm (2 in) must b ...
Installation Procedure
Cut the rocker outer panel in corresponding locations to fit the
remaining original panel. The sectioning joint should be trimmed to
allow a gap of one-and-one-half-times the metal thickness at the sectioning
joint.
Create 50 mm (2 in) backing plates from the unused portion of the
...