Note: According to different corrosion warranties, only the regional mandatory joining methods are allowed.
Installation Procedure
Removal ProcedureBasecoat/Clearcoat Paint Systems
Warning: Exposure to isocyanates during paint preparation and
application processes can cause severe breathing problems. Read and
follow all of the instructions from the manufacturers of painting materials,
equipment, and protective gear.
All paint finish repairs of rigid exterior surfaces mus ...
Test Probe Caution
Caution: Do not insert test equipment probes (DMM etc.) into any
connector or fuse block terminal. The diameter of the test probes will
deform most terminals. A deformed terminal will cause a poor connection, which
will result in a system failure. Always use the EL-35616
GM-Approved Terminal T ...
Installation Procedure
Prepare all mating surfaces as necessary.
Align the front hinge pillar body reinforcement.
Create 6 x 20 mm (4/16 x 12/16 in) slots for MIG-brazing in locations
where you can not apply a resistance spot
welder.
Clean and prepare the attaching surfaces for spot welding a ...