Water Management Description and Operation
Floor Carpet DryingInstallation Procedure
Align the rocker inner panel.
Drill 8 mm (5/16 in) for plug welding along the edges of the quarter
outer panel as noted from the original panel.
Clean and prepare the attaching surfaces for welding.
Position the rocker inner panel on the vehicle.
Verify the fit of ...
Wheel Stud Replacement
Special Tools
CH-43631 Ball Joint Remover
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Raise and suitably support the vehicle. Refer to Lifting and
Jacking the Vehicle.
Remove the tire and wheel assembly. Refer to Tire and Wheel Removal and
Installati ...
Instrument Panel Upper Trim Pad Insert Replacement
Preliminary Procedure
Remove the instrument panel. Refer to Instrument Panel Assembly Replacement.
Instrument Panel Upper Trim Pad Insert Screw (Qty: 6)
Caution: Refer to Fastener Caution in the Preface section.
Tighten
2.5 N·m (22 lb in)
Instrument Panel Upper Trim Pad Insert Asse ...