OnStar Additional Information
IntroductionInstrument Panel Upper Compartment Replacement
Instrument Panel Upper Compartment Screw (Qty: 2)
Caution: Refer to Fastener Caution in the Preface section.
Procedure
Before removing the instrument panel upper compartment screws, remove mat.
Tighten
2.5 N·m (23 lb in)
Instrument Panel Upper Compartment Assembly
...
Installation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing
(1).
Clean and prepare the attaching surfaces for spot welding and brazing.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear
of structural adhesive.
Apply structural adhesive to all attaching surfaces ...
Rear Side Door Check Replacement
Preliminary Procedure
Remove rear side door trim panel. Refer to Rear Side Door
Trim Replacement
Remove the rear side door water deflector. Refer to Rear Side Door Water
Deflector Replacement
Rear Side Door Check Bolt
Caution: Refer to Fastener Caution in the Pre ...