Roof
Head RestraintsInstallation Procedure
Cut the front compartment upper side rail in corresponding locations to
fit the remaining original panel. The sectioning joint should
be trimmed to allow a gap of one-and-one-half-times the metal thickness at
the sectioning joint.
Create a 50 mm (2 in) backing plate from the unused ...
Stabilizer Shaft Replacement
Special Tools
CH 904 Underframe
CH 49289 Centering Adapter
EN 45059 Torque Angle Sensor Kit
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Turn the front wheels to the straight forward position and secure the
steering wheel from moving.
...
Installation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing
(1).
Clean and prepare the attaching surfaces for spot welding and brazing.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear
of structural adhesive.
Apply structural adhesive to all attaching surfaces ...