Specifications

Body repair
Front End Upper Tie Bar ReplacementInstallation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing
(1).
Clean and prepare the attaching surfaces for spot welding and brazing.
Note: In MIG-brazing areas 50 mm (2 in) must be kept clear
of structural adhesive.
Apply structural adhesive to all attaching surfaces ...
Power Steering Pump Belt Replacement
Special Tools
CH 49800 Installer Power Steering Pump Belt
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Caution: Do not use belt dressing on the drive belt. Belt dressing
causes the breakdown of the composition of the drive belt. Failure
to follow this recommendatio ...
Floor Air Outlet Duct Replacement - Right Side (Right Hand Drive)
Removal Procedure
Remove instrument outer trim cover -- right side. Refer to Instrument
Panel Outer Trim Cover Replacement - Right Side.
Remove instrument panel lower trim pad cover -- left side. Refer to
Instrument Panel Lower Trim Pad Cover Replacement.
Remove flo ...