How To Indentify Plastic Parts
Fixed and Movable WindowsCollision Repair
Specifications
Point-to-point measurements are for reference only. All measurements are
given in millimeters. Use these measurements for diagnosing
and estimating. Point-to-point measurements are duplicated with tram bar
pointers set at equal lengths. All die marks, holes, slots, and
fast ...
Installation Procedure
Create 8 x 14 mm (5/16 x 15/16 in) slots for MIG-Brazing along the edges
of the drivetrain and front suspension frame front support
as noted from the original panel.
Clean and prepare the attaching surfaces for brazing.
Position the drivetrain and front suspension frame ...
Installation Procedure
Prepare all mating surfaces as necessary.
Align the front hinge pillar body reinforcement.
Drill 8 mm (5/16 in) for plug welding along the edges of the front hinge
pillar body as noted from the original
panel.
Clean and prepare the attaching surfaces for welding.
...